Port Bolivar, Texas, 7th Street Bridge Replacement Update With Bolivar Live.
Posted By David/ Monday, August 12, 2024

Port Bolivar, Texas, 7th Street Bridge Replacement Update With Bolivar Live.

We reached out to TxDot on the replacement of the 7th Street Bridge and how the timing is going on opening it back up, I'm happy to say, Listen In, we're about 49 days out, off only by 2 weeks due to Hurricane Beryl and a Week Of Rain. BTYB: www.TheBigStore.us #txdot #texas #roadconstruction #bolivarpeninsula #crystalbeach #news #roadcondition #media #bolivarlive #information #weather #localnews #hometown #transportation #bridge

Add Your Comment

Thank you for posting your comments. We will review them shortly and add them to our blog!

Latest Posts

Posted 10/29/2025/By David
Surface water temperature 77 degrees.
Posted 10/22/2025/By David
East Bay 10/22/2025 - Surface water temperature 78 degrees
Posted 10/14/2025/By David
Surface water temperature 78 degrees.
Posted 10/7/2025/By David
Surface water temperature 82 degrees.
Posted 10/1/2025/By David
Surface water temperature 82 degrees.
© Copyright 2025, Coastal Outdoors Group, LLC, All rights reserved.
Website by Coastal Outdoors Group