Bolivar Lighthouse Transformation Begins With Hydro-Blasting, A Closeup View.
Posted By David/ Saturday, November 16, 2024

Bolivar Lighthouse Transformation Begins With Hydro-Blasting, A Closeup View.

I've been talking about the work at the Bolivar Lighthouse that started this week. It was all ground level for the first day, but now, it's up where you can see. We've been taking Coastal One up and with the 7X zoom, we're going to give you an up-close look at the process. remember you can see it anytime thru the Fort Travis Area Cam at, www.BolivarPeninsulaTexas.com/Webcams/Fort-Travis/Area-Webcam BTYB: www.theBigStore.us #bolivarlighthouse #bolivarpeninsula #texas #lighthouse #crystalbeach #history #hurricanes #forttravis #bolivarferry #bolivarlive #media #information #travel #tourism #beach #vacation #tv #weather #freshseafood #familyfun #thanksgivngweekend

Add Your Comment

Thank you for posting your comments. We will review them shortly and add them to our blog!

Latest Posts

Posted 10/29/2025/By David
Surface water temperature 77 degrees.
Posted 10/22/2025/By David
East Bay 10/22/2025 - Surface water temperature 78 degrees
Posted 10/14/2025/By David
Surface water temperature 78 degrees.
Posted 10/7/2025/By David
Surface water temperature 82 degrees.
Posted 10/1/2025/By David
Surface water temperature 82 degrees.
© Copyright 2025, Coastal Outdoors Group, LLC, All rights reserved.
Website by Coastal Outdoors Group