A Look At Rollover Pass, The Work In Progress And Closing.
Posted By David/ Wednesday, November 13, 2019

A Look At Rollover Pass, The Work In Progress And Closing.

As everyone knows Rollover Pass, the work to fill it in has begun. History is being filled in, today we'll see the progress from our feed a few weeks ago. You can always view work in progress on our LIVE Rollover Pass Webcam at www.BolivarPeninsulaTexas.com streaming 24 hours a day. BTYB- The Big Store #crystalbeachtx #bolivorpeninsulatx #rolloverpass #bolivarlive

Add Your Comment

Thank you for posting your comments. We will review them shortly and add them to our blog!

Latest Posts

Posted 4/28/2025/By David
Surface water temperature 7 7 degrees.
Posted 4/22/2025/By David
Surface water temperature 76 degrees.
Posted 4/17/2025/By David
Surface water temperature 74 degrees.
Posted 4/14/2025/By David
Escape to the Texas coast for the perfect weekend getaway on Bolivar Peninsula. With beautiful beach
Posted 4/14/2025/By David
Today, we're at the iconic Rollover Bay, diving into its rich history and showcasing the incredible
© Copyright 2025, Coastal Outdoors Group, LLC, All rights reserved.
Website by Coastal Outdoors Group